± 800 kV EHV DC transmission and transformation project phase II for Brazil Tucurui Hydropower

Publication Date:2015-09-08
       The converter station and its supporting at the two sides of the project are built in EPC mode. The project is consisted of two ground rods, related substation extension for Rio converter station at the receiving end and line π connection and supporting works, and nine communication relay stations. The rated transmitting power is 4 million kW. The contract was signed in Jul 2015.